The masonry and concrete class codes
Massachusetts does not use the national NCCI manual the way most states do. The Workers' Compensation Rating and Inspection Bureau of Massachusetts (WCRIBMA) classifies Massachusetts risks and files the manual rates. A code you find on a generic national website may not match your Massachusetts policy, so every rate on this page was read directly from WCRIBMA Circular Letter No. 2431, Exhibit 1, effective July 1, 2024. Those rates remained in effect after the Commissioner disapproved the 2025 filing on May 15, 2025.
| Class code | WCRIBMA description (abridged) | Manual rate | Who it fits |
|---|---|---|---|
| 5022 | Masonry NOC | $5.56 | The governing code for most masonry contractors: brick, block, and stone laying, chimney building and repair, repointing, veneer, and restoration work not separately classified. |
| 5213 | Concrete construction NOC | $6.11 | Concrete construction not otherwise classified, such as formed and structural concrete work that goes beyond flat work. Higher than the masonry code, which is why the scope description on your application matters. |
| 5221 | Concrete or cement work, floors, driveways, yards or sidewalks & drivers | $4.62 | Flat work: slabs, floors, driveways, walkways, patios, and similar horizontal concrete. A mason who also pours flat work should see this payroll separated, with records. |
| 5215 | Concrete work, incidental to construction of private residences | $3.79 | Concrete work that is incidental to building private residences, such as footings and foundations poured as part of a residential job rather than as a standalone concrete operation. |
| 5222 | Concrete construction in connection with bridges or culverts | $5.69 | Heavy and civil concrete work tied to bridges and culverts. Shops doing public or infrastructure work should expect this code, and prevailing wage payroll records to go with it. |
| 5348 | Stone, mosaic, terrazzo or ceramic tile work, inside | $2.83 | Interior stone, tile, and terrazzo setting. Interior only. The same setter doing exterior veneer or structural stone is masonry payroll for those hours, at 5022. |
| 4034 | Concrete products manufacturing & drivers | $5.15 | Shops that manufacture precast concrete products, block, or similar products at their own yard, as distinct from installing them in the field. |
| 5606 | Contractor, executive supervisor or construction superintendent | $0.80 | Supervisors who oversee work through superintendents and foremen and do not do hands on masonry. Strictly defined. A working foreman with a trowel in hand does not belong here. |
Rates are manual rates per $100 of payroll, WCRIBMA Circular Letter No. 2431, Exhibit 1, effective July 1, 2024. Your carrier applies its own pricing, your experience modification factor, schedule rating, and assessments on top of the manual premium.
Who must be covered, and who may opt out
Under M.G.L. c. 152, § 25A, every employer in Massachusetts must carry workers' comp for its employees, including part time and short hour help. The Department of Industrial Accidents enforces this, and operating without coverage can bring a stop work order, daily civil penalties, and, in serious cases, criminal exposure for officers.
Sole proprietors, LLC members, and partners
Not required to cover themselves, but must cover any employee who is not a member or partner.
Corporate officers
Officers who own at least 25% of the corporation may elect to exempt themselves. The exemption is a filing, not an assumption, and it does not exempt the crew.
Officer and owner payroll
Rated at state minimum and maximum payroll amounts when owners are included. Those figures change by year, so confirm the current amounts at quote time rather than relying on an old proposal.
How the premium is actually built
There is no honest flat price for masonry comp, because the price is a formula, not a product. Anyone quoting you a single number without payroll by class is guessing.
- Payroll ÷ 100 × manual rate, class by class, gives the manual premium.
- Experience modification factor then raises or lowers it based on your loss history versus similar shops. A mod of 1.00 is average.
- Carrier pricing, schedule credits or debits, and assessments follow. Two carriers can price the same correct payroll noticeably differently.
- The audit trues it up. Estimated payroll becomes actual payroll, uninsured subs get added, and misclassified hours get moved. Clean records are a pricing tool, not paperwork.
Why severity drives the masonry rate
Masonry losses are heavy losses. Falls from scaffolding are the severity driver: a fall from a platform or a chimney scaffold produces the kind of claim that sits in your mod for years. Material handling strains and struck-by injuries add frequency on top. That combination, height plus heavy material plus cutting dust, is what the $5.56 rate is pricing, and it is why scaffold discipline shows up directly in your premium through the mod.
Workers' comp estimator
Enter annual payroll for the work your people actually do. Leave a line at zero if it does not apply. The math is the manual premium formula above, using the verified July 1, 2024 WCRIBMA rates. This is an estimate for planning and comparison, not a quote and not bindable.
Massachusetts masonry & concrete, manual premium estimate
Rates per $100 of payroll: 5022 at $5.56 · 5213 at $6.11 · 5221 at $4.62 · 5215 at $3.79 · 5348 at $2.83 · 5606 at $0.80. Source: WCRIBMA Circular 2431, eff. 7/1/2024.
Carrier expense constants, premium discounts, schedule rating, DIA assessments, and payment plan fees are not in this estimate because they vary by carrier and policy. A real quote applies them openly, line by line.
Before carrier specific charges and credits. Compare this structure, not just the total, against any proposal you receive.
- Total rated payroll
- $272,000
- Manual premium
- $12,084
- After experience mod
- $12,084
- Blended rate / $100
- $4.44
- Uninsured sub exposure
- $0
Worked check at the default values: ($160,000 ÷ 100 × $5.56) + ($60,000 ÷ 100 × $4.62) + ($52,000 ÷ 100 × $0.80) = $8,896 + $2,772 + $416 = $12,084 manual premium at a 1.00 mod. Change any payroll line and the panel recalculates live using the same formula.
Masonry, concrete, and stone setting are three different prices
One crew often does all three in the same week: lay the block, pour the walk, set the interior stone. Massachusetts prices those hours at $5.56, $4.62, and $2.83. Getting the split right is the largest controllable lever in a masonry comp premium, and getting it wrong in either direction costs money, at quote time or at audit.
The split, code by code
- Masonry NOC, 5022 at $5.56, is the governing code: brick, block, stone, chimneys, repointing, veneer, restoration.
- Concrete splits by what is being built: flat work is 5221 at $4.62, residential incidental is 5215 at $3.79, structural NOC is 5213 at $6.11, bridge and culvert work is 5222 at $5.69.
- Interior stone and tile setting is 5348 at $2.83. The word "inside" does real work. Exterior veneer and structural stone are masonry payroll.
- Supervision has limits: 5606 at $0.80 is for executive supervisors who direct through others. A foreman who lays block alongside the crew is masonry payroll for that work.
Records that survive audit
- Payroll can be split between codes for the same employee only with contemporaneous time records by type of work. Percentages reconstructed at audit usually fail.
- The governing classification covers the business as a whole when a split is not supported. One unsupported split can pull an entire payroll into the highest applicable code, which for a mixed shop can mean 5213 at $6.11.
- Practical setup: timekeeping buckets that match how you already bid, masonry, flat work, residential concrete, interior setting. If your bids separate the work, your payroll records should use the same language.
If you mostly lay brick and block
Your premium fight is the mod and the audit, not the code. Scaffold discipline, material handling, and silica controls move your loss record, and clean sub certificates keep masonry payroll from growing at audit.
If you mix masonry and concrete
Your fight is classification. Flat work payroll sitting in 5022 pays $5.56 where $4.62 applies, and structural concrete described as masonry gets moved to $6.11 at audit. Bring job level records to the quote, not just a total payroll figure.
If you do restoration work
Repointing and chimney work are still 5022, but tell the underwriter the mix honestly. Restoration is scaffold heavy and chimney heavy, and carriers price what they can see. A vague application gets the worst assumption.
Getting out of the assigned risk pool
If two carriers decline you, Massachusetts does not leave you bare. Coverage is available through the Massachusetts Workers' Compensation Assigned Risk Pool, administered by WCRIBMA under M.G.L. c. 152, §§ 65A–65C. The pool keeps you legal and working. It is also, for most shops, the most expensive and least flexible way to buy comp, with a servicing carrier you did not choose. Treat it as a work program with an exit, not a home.
Fix the classification
Confirm every payroll dollar sits in the right code, with time records to prove the masonry, flat work, and interior setting split. Overclassified payroll is the fastest premium reduction available and requires no waiting period.
Clean the loss record
Same day reporting, modified duty, scaffold and silica controls in writing, and closing out stale claims. Voluntary carriers read three years of loss runs. The work starts a full renewal cycle before the exit quote.
Make the audit boring
Certificates current for every sub, payroll records that match the tax filings, officer exemptions properly filed. A clean audit history is an underwriting argument.
Remarket early
Bring the corrected story to voluntary carriers 90 days before renewal, with loss runs, the class code breakdown, and the safety steps in writing. Shops exit the pool on evidence, not on hope.
Claims management is a pricing strategy
Most small shops treat claims as paperwork. Larger organizations treat claims management as a line item, because it goes directly to the bottom line. In masonry, the same logic holds at small scale: your experience mod is your loss record, priced, and it follows you for years.
- Report injuries the same day and file the Employer's First Report (Form 101) on time. Falls, strains from material handling, and struck by injuries get harder to manage with every day of delay.
- Return to work, modified duty included, is the strongest mod lever a small shop controls. A mason on light duty mixing, cutting with controls in place, or running the yard is recovering and costing the claim less than the same person home with no plan.
- Investigate while it is fresh: photos of the scaffold setup, witness names, the load involved, and what changes so it does not repeat. Carriers and auditors both read that file.
- Review open claims before renewal, not after. Reserves set the mod, and a stale reserve on a closed out injury is worth a phone call.
None of this requires a safety department. It requires the owner spending an hour a month on the part of insurance that actually compounds. The cost page shows what a mod swing is worth in dollars.